Bullseye

The interesting picture of Jeff above, was taken through one of the vent pipes set into the West wall. On the side over the bathroom, the wall extends up to the ceiling.  With very little room, it took using a yogurt container to fill the blocks.

 

pastedGraphic.pdf

 

pastedGraphic_1.pdfIn preparation for framing in the arch window, I used a Ramset gun to set tie wire into the shell.  A curved piece of rebar was then attached to the wire.  This will “support” the concrete that we will spray/fill into the gap between the shell and the arch framing.

 

pastedGraphic_2.pdfpastedGraphic_3.pdf

 

The other task accomplished this weekend was the removal of all the remaining tie wire that was sticking out of the concrete. This is the wire that was tied around the wood slats supporting the foam panels. Jeff was very busy with the wire cutters.

 

We now have some patching to do on the really rough spot of our walls.  Then they will be ready for a final plaster coating.

 