Rain Rain, Go Away

Well the rain that has been with us for nearly a week looks to be letting up.  Over the past weekend we had some pretty strong winds/ driving rain and I thought that much of the form work that was done last week would be ruined.   Thankfully, everything seemed to survive.If it stays clear, tomorrow, Jeff and I will be laying out exactly where the interior walls will be.  This is so the plumber can properly place the rough-in plumbing that goes under the concrete floor.  He’s coming on Friday.  The concrete guys won’t be able to complete their work until the plumbing and electrical conduits that go under the floor are in place.  This weekend we willpastedGraphic.pdf also be putting in the SonoTubes for the column supports at the ends of the retaining walls.  Dozy has a hydraulic post hole digger which I used last week.  Our contractor said the hole wasn’t deep enough so I had the local boat yard weld on a 3 foot extension.  This should give us about a 7 foot deep hole.